Construction works along the A512 (3)
The next series of photos were taken in late March 2021.
Traffic continued to flow in both directions along the future westbound lanes; the eastbound lanes are unfinished in this picture. |
The bare slopes on the side of Junction 23 of the M1. |
The A512, looking eastward towards Loughborough. |
Earthworks near Junction 23. |
One of the slip ramps of the M1. |
One can only truly grasp how much of a long way down it is down the slope by being here! |
Looking east from Junction 23 towards the new roundabout. |
The new roundabout under construction. |
A new drainage pond next to the new roundabout. |
The new eastbound lanes of the A512. |
Looking eastwards towards the new roundabout. |
Looking west towards the M1. |
The new roundabout. |
Looking towards the M1. |
The stub of road on the north side of the roundabout that will eventually form the new main route through the Garendon housing estate. |